LIGHT / POWER / CONTROL
A plan for every room.
Your first-pass specification, mapped onto the remodeled floors.
Select a room or device to inspect its controls and circuit.
01 / ROOM LAYOUTS
The house, connected.
Read-only layout · Select a device to inspect its specification and circuit.
Colored symbols are the new design. Pale architectural symbols are part of the source PDF and are not counted. Dashed purple links show control relationships, not cable routes. Position and spacing are preliminary.
02 / CIRCUIT SCHEDULE
Power, circuit by circuit.
| ID | Serves | Breaker / supply | Protection in brief | Scope |
|---|
Circuit numbers are design references, not panel-slot assignments. Proposed ratings and protection are from the supplied brief, pending equipment and electrician review. Indoor heat-pump unit supply via outdoor interconnect is not yet confirmed.
03 / DECISIONS STILL OPEN
Resolve before ordering.
04 / WHOLE-HOUSE BILL OF MATERIALS
One design. One material list.
Generated from the mapped devices, controls and circuit schedule.
| Item / specification | Ground | Top | Exterior | Total | Status / notes |
|---|
Fixture rows include housing, module and trim as one complete assembly; these are not additive part counts. Quantities are for bid planning, not a released purchase order. Existing equipment is separated; wire sizes/lengths and unresolved materials are not guessed.